India's recently unveiled National Wind-Solar Hybrid Policy,
. . . will help the country meet the target of
. . . 175 Gw renewable energy capacity by 2022
. . . (up from 69 Gw now),
by cutting generation costs by a quarter, analysts said.
The cost reduction, would be enabled by
. . . nearly doubling the generation,
. . . at a nominal cost,
. . . thanks to reduced variability of output,
. . . through optimal utilisation of assets,
. . . where wind turbines, and solar systems,
. . . will be configured at the same grid connection points.